How to Choose a Rockwool Panel

How to choose a rockwool panel: five-step selection by room use, route, thickness, density and joint, using company catalogue facts only.

Panel facts at a glance

Step 1: Name the room and the area

Start with the room, not the panel. Is the area a production hall, a laboratory, a food preparation area or a corridor? Is it a wall or a ceiling? Each area gets its own line on the schedule, because a ceiling and a wall in the same room can need different thicknesses. List doors, openings and penetrations for each area at this stage, not after the panel is chosen.

Step 2: Choose the route

Choose handmade Type 50 when the area needs pre-formed openings or conduit routes, a width outside the 1,150 mm convention, or the staggered fibre structure's load-bearing behaviour. Choose machine-made 1150 type when the area is a long straight run where a tongue-and-groove joint gives fast, uniform jointing. Split the schedule by area if different areas need different routes.

Step 3: Choose the thickness

For handmade panels, choose 50 mm as the conventional thickness, or a custom 75 / 100 mm option, confirmed for that area. For machine-made panels, choose a thickness within the 50–150 mm range for that area. Do not carry a thickness from one route to the other without a check, because the thickness sets are different.

Step 4: Choose the density

Choose a density within the 60–120 kg/m³ catalogue range, and state the driving requirement behind it: fire, sound, heat or a combination. This site gives no density-to-performance conversion, so the density choice must be confirmed together with the route and thickness, not chosen alone.

Step 5: Choose the joint, then confirm before ordering

Match the joint to the route: male-female or centre-aluminium for handmade panels, tongue-and-groove for machine-made panels. Then run the inquiry checklist: colour and facing, pre-formed work, certificates required, and the items to confirm before ordering and before payment. Before ordering, confirm the minimum order quantity and the lead time in your inquiry.

Send your room list for a five-step rockwool panel selection check — Go to the inquiry checklist or email [email protected]. Phone (company public contact): +86 13929918930.